Welcome to Sarili
Our Values
Our Values are important to us

As a reputable company, we ensure that all projects are done with utmost professionalism.

Honest & Dependable

We proud to be one of the most trusted construction companies in South Africa.

We are always improving

We commit ourselves to complete all projects within the timeline set with our clients.

About Us

Who Are we?

Sarili is an established, independent, BEE level 1 verified earthmoving, construction and project management company.

The vast experience of the Managing Director in the construction and earthmoving industry and a close association with other companies, allows Sarili the ability to provide efficient cost-effective solutions to clients in earthmoving and construction requirements in many sectors.

02

Contact us for more Information :
011 805 1116

03

Contact us for more Information :
011 805 1116
Mapela Orphanage Centre

Social Development

Sarili believes in giving back to the communities in which we work in. This, to such an extent that we have recently sponsored and constructed a much needed orphanage drop-in centre within the boundaries of Mapela, next to the Mogalakwena Platinum Mine.

R1 500 000 was invested in this initiative, whilst job opportunities and in-service training was provided to 64 local residents.

Being responsible contractors, we believe this is the future, encourage others to follow suit, and will continue to embark on similar projects, jointly with our clients, subcontractors and other stakeholders.

2 (1)
Our Growth

Further Development

In February 2011, Sarili entered into its first external contract with African Mobile Crushers working in Hotazel, near Kuruman. Sarili was able to provide a 90% availability of plant for the mine’s crushing operation because it was running double shifts and had its own workshop.

In September 2011, Sarili started a project with the Power Group in Steelpoort and then moved with them to a new project development in Midrand. In September 2012, a one year contract was signed with Pamaplim and Anglo Platinum for Load and Haul Operations & feeding of the crusher at the Mogalakwena Mine outside Mokopane, Limpopo.

Starting with just 70 000 tons per month, the mine soon realised Sarili’s potential and the required quantity was increased to 150 000 tons per month.

Such was the confidence of the Principle, that the contract was renewed for another year, and the required tonnage per month increased to 421 000 – feeding one of the two mine crushers exclusively on a 24 hour continuous basis. This contract has now been extended to a three year contract until January 2018.

In addition to the original fleet mentioned above, Sarili has three Excavators, Cat 385, Liebherr 984 & Hitachi 1200. five Cat Trip 7’s on the load and haul team running three eight hour shifts. In support of the main team is the 18 000 litre diesel bowser, Cat 140G Grader, a B40D 18 000 litre water cart, and D8 Dozer all ensuring that the load area and haul roads are maintained to the required standards of the mine.

Testament to the efficiency and professionalism of the Sarili staff, the safety record is of an exceptionally high standard. In line with this, we have adopted our slogan: “Safe Production*, where we proclaim that a ‘Safe Operation, is a Productive Operation”. In layman’s terms, this simply refers to our core value that we do not attempt to take on any operation, unless it can be done safety. We further then believe that any operation can be done safely, by following the correct procedures.

There is no doubt that the commitment of all the Sarili staff has led to the growth of the company from SME with a turnover of less than R5 million a year to a turnover of > R7 million a month.

Sarili Construction
Sarili Construction
Sarili Mining
Company Background

Sarili Construction was established in 2007

In 2007 Sarili Construction and Projects was formed initially with four members and started physical operations in late 2007, with the support of Barloworld and WBHO Construction.

In 2009 Sarili Construction converted to a (Pty) Ltd company and has grown in strength. Over the last two years work has been completed at PP Rust and Sarili also worked at the Bedford, Braamhoek Dams Joint.

From 2012 until present Sarili Construction and Projects started working at Anglo Mogalakwena Platinum mine in joint venture with Pamaplim feeding Big Bruce Crusher at South Concentrator at a tonnage of 380 000 tons per month.

Projects

View Our Best Work

01

Oct 2007 - July 2008

Earthmoving & Construction on Anglo Platinum Mine (Mogalakwena)

02

July 2008 - Apr 2010

Bedford & Braamhoek Dams Project at Harrismith

03

May 2010 - Nov 2010

River Diversion Crossing

Sarili Construction, since 2007

Our promise as a contractor is to build community value into every project while delivering professional expertise, exceptional customers service and quality construction.

safety

Safety at Sarili

Ensure compliance with the Safety Risk Management Programme

Target: Coaching of Procedures relevant to the scope of work : for example Operating of equipment Implementation of controls on all identified hazards

Conduct safety inspections

Target30 Days; 60 Days and 90 Day Scheduled Inspections

Ensure PTOs VFLs are conducted in the sections

Target: 2x PTOs and 1x VFLs per supervisor per day All employees covered by end of month

Know your area controls:

Hazards, Workplace controls and what can I control

Ensure compliance with Mogalakwena Mine safety improvement plan TargetImprovement tracker monthly review

Sub-Contractor Management

TargetEnsure compliance with contractor engagement requirements and regular auditing on Contractors Pack and Operational File

Ensure compliance with hearing conservation program.

Target: Issue hearing protection to identified employees working in noise demarcated zones/ areas

To implement fatigue management.

TargetInstallation of fatigue monitors and implementation of fatigue breaks

To promote Emergency Preparedness.

Target: Conduct regular emergency evacuation drills With assistance from Emergency Services

To Improve compliance to Public Health Requirements.

TargetConduct regular inspections on toilet facilities

To improve airborne pollutant control programme

Target: Dust allaying and suppression on haul roads.

Prevention of hydro-carbon spillages

Ensure availability spill kits where equipment maintenance/ repairs are undertaken

Target: Ongoing

Waste Sorting

Sort waste into correct bins and skips according to waste management procedures

Target: Ongoing

House Keeping

Conduct regular house keeping to maintain a clean and safe working environment.

TargetDaily

get in touch

Complete the form and we will get back to you as soon as possible.

contact

Contact Us

Location

Unit 6 Lomac Park., 122 Richards Dr, Midrand

Number

011 805 1116

email

info@sarili.co.za

© All rights reserved Sarili Construction

Designed & developed by Pixl Online Solutions